Our team provided general contracting, construction, and installation services for University of Western Ontario. After the old synthetic turf had reached its end of life cycle, we incorporated a sustainable sports field reclamation initiative, resulting in the old turf field being repurposed. This project also included the removal of the previous e-layer and stone base and replaced with a laser-graded dynamic aggregate base. This project included the installation of a FIFA One Turf Compliant synthetic turf field on a performance pad and TPE infill, custom centre field & end zone logos and lines. Additionally, a custom pit complex for long jump was installed.